Transparent production metrics
How the CSP model works
The headline contains only the production match-winner model and one frozen prediction per match.
Settled
1359
Accuracy
58.1%
Baseline
57.1%
Brier score
0.243
Log loss
0.679
Quality by confidence
| Stated probability | Settled | Accuracy | Brier |
|---|---|---|---|
| 0.5-0.6 | 914 | 56.1% | 0.246 |
| 0.6-0.7 | 413 | 63.4% | 0.23 |
| 0.7-0.8 | 32 | 43.8% | 0.326 |
Calibration
Predicted probability compared with the observed outcome rate.
0.2-0.3 · n=4
28.7% / 75.0%
0.3-0.4 · n=70
37.5% / 47.1%
0.4-0.5 · n=455
45.4% / 48.8%
0.5-0.6 · n=459
54.9% / 61.0%
0.6-0.7 · n=343
64.6% / 65.6%
0.7-0.8 · n=28
71.5% / 46.4%
Separate from the headline
Experimental models
Map totals and round totals are still being validated and never affect the production winner accuracy shown above.
By market
| Market | Settled | Accuracy | Won / Lost |
|---|---|---|---|
| Map round totals | 1359 | 58.1% | 776 / 583 |
By line
Map round totals
| Line | Settled | Accuracy |
|---|---|---|
| 19.5 | 453 | 65.8% |
| 20.5 | 453 | 56.3% |
| 21.5 | 453 | 52.1% |
Immutable settled history
Prediction archive
| Date | Market | Match | Line/Map | Pick | Probability | Outcome |
|---|---|---|---|---|---|---|
| 2026-11-16 18:00 UTC+3 | Map round totals | BAKS — MASONIC | 21.5 · nuke | over | 45.0% | won |
| 2026-11-16 18:00 UTC+3 | Map round totals | BAKS — MASONIC | 20.5 · nuke | over | 54.0% | won |
| 2026-11-16 18:00 UTC+3 | Map round totals | BAKS — MASONIC | 19.5 · nuke | over | 61.0% | won |
| 2026-11-16 18:00 UTC+3 | Map round totals | BAKS — MASONIC | 21.5 · mirage | over | 53.0% | won |
| 2026-11-16 18:00 UTC+3 | Map round totals | BAKS — MASONIC | 20.5 · mirage | over | 56.0% | won |
| 2026-11-16 18:00 UTC+3 | Map round totals | BAKS — MASONIC | 19.5 · mirage | over | 61.0% | won |